our Project

Cedar Ridge Community School

Cedar Valley Community School is a steel-framed structure with brick masonry veneer exterior that has two-levels with twenty-four classrooms. These classrooms share movable walls to encourage team teaching. In addition, the elementary school includes a new media center, library, computer lab, story room and gymnasium. The gym is 7,400 SF with tournament-level flooring.

Unique Project Features

The project was constructed to preserve options for future development. Hillside location allows on-grade entry on both levels of the two-story classroom cluster.
FACTS

Project
Details

Size: 64700 SF
Location: Edmonds, WA
Owner: Edmonds School District
Architect: Mahlum Architects
Completion: Fall 2001
Project type: $12,680,000